3V0-32.21 Training & Certification Get Latest VCAP-CMA Design 2021 Updated on Nov 21, 2022 [Q11-Q35]

Share

3V0-32.21 Training & Certification Get Latest VCAP-CMA Design 2021 Updated on Nov 21, 2022

Certification Training for 3V0-32.21 Exam Dumps Test Engine


The following section is outlining the topics of the VMware 3V0-32.21 Certification Exam

3V0-32.21 Dumps cover the following topics of the VMware 3V0-32.21 Certification Exam:

  • Planning and Designing
  • Performance-tuning, Optimization, and Upgrades
  • Products and Solutions

 

NEW QUESTION 11
A financial business wants to reduce the time-to-market by automating the end-to-end testing of a prime service application and releasing it with minimal user intervention.
Which service in vRealize Automation will allow the business to achieve the requirement?

  • A. Cloud Assembly
  • B. Code Stream
  • C. Service Broker
  • D. Orchestrator

Answer: B

 

NEW QUESTION 12
A customer requests a conceptual design for the Cloud Management solution.
What three selections represent a conceptual design? (Choose three.)

  • A. Identity Management
  • B. vRealize Automation
  • C. Monitoring and Logging
  • D. Workspace One Access
  • E. Cloud Automation
  • F. vRealize Log Insight

Answer: A,C,E

 

NEW QUESTION 13
An architect designed a vRealize Log Insight (vRLI) cluster for an organization with the following details:
The cluster has 3-nodes with 2 event forwarders sending logs to this cluster.
The vRLI cluster is part of the disaster recovery protection process.
What should be the proper sequence of steps in the Disaster Recovery (DR) protection runbook for recovering vRLI cluster?

  • A. 1. Restore the master node
    2. Restore worker nodes in any order
    3. Restore the forwarders
    4. Restore any recovered agents
  • B. 1. Restore the master node
    2. Restore worker nodes in a specific defined order
    3. The forwarders
    4. Restore any recovered agents
  • C. 1. Restore the forwarders
    2. Restore worker nodes in any order
    3. Restore the master node
    4. Restore any recovered agents
  • D. 1. Restore the worker nodes
    2. Restore master node
    3. Restore the forwarders
    4. Restore any recovered agents

Answer: A

 

NEW QUESTION 14
Which two statements are correct for VMware Cloud Services cloud proxy? (Choose two.)

  • A. An OVA must be deployed on a vCenter Server.
  • B. It connects cloud services to on-premises networks.
  • C. It requires a load balancer.
  • D. It helps connect to public cloud entities.
  • E. An OVA deployment to an ESXi server is supported.

Answer: A,B

 

NEW QUESTION 15
A customer wants to deploy Workspace ONE Access for vRealize Suite users.
The customer wants to achieve the following requirements:
Availability SLA 95% uptime per month, calculated Monday-Friday, 24 hours per day.
The deployment footprint must be minimal.
Which design decision should the architect choose?

  • A. Deploy a Workspace ONE Access node and protect it with vSphere HA.
  • B. Deploy a Workspace ONE Access cluster and protect it with vSphere HA.
  • C. Deploy a Workspace ONE Access cluster and protect it with Fault Tolerance.
  • D. Deploy a Workspace ONE Access node and protect it with Fault Tolerance.

Answer: C

 

NEW QUESTION 16
An architect is designing a certificate strategy for vRealize Operations (vROps) to satisfy the following requirements:
Enhance security
Avoid browser warnings
The certificate must be applicable for all vROps servers
Which three design decisions would fulfill the requirements? (Choose three.)

  • A. The solution will use CA-signed certificates.
  • B. Certificates will use the PFX and/or PKCS12 format.
  • C. The solution will use self-signed certificates.
  • D. Certificates will use the PEM format.
  • E. Certificates will be created using the Diffie-Hellman security-key algorithm.
  • F. Certificates will use multiple Subject Alternative Name (SAN) entries.

Answer: A,D,F

 

NEW QUESTION 17
An architect has been asked about migrating a client's vRealize Automation solution from version 7.x to version 8.x. One of the requirements is to continue to support custom XaaS (Anything as a Service) blueprints that the client has developed.
Which component of a vRealize Automation logical design will fulfill this requirement?

  • A. Cloud Zones
  • B. Cloud Assembly
  • C. Service Broker
  • D. Cloud-Init

Answer: A

 

NEW QUESTION 18
An organization has a set of requirements for its private cloud:
Provide the ability to reclaim idle VMs deployed in vRealize Automation (vRA) Report on the health of resources provisioned in vRA Calculate the cost of VMs provisioned in vRA Optimally place vRA deployment workloads to vSAN and avoid contention Which cloud management product should be integrated with vRA to meet these requirements?

  • A. vRealize Orchestrator
  • B. vRealize Suite Lifecycle Manager
  • C. vRealize Operations
  • D. vRealize Log Insight

Answer: A

 

NEW QUESTION 19
An architect is designing a vRealize Log Insight cluster for an organization. The organization has the following requirements:
No requirement for archival data
Support a log data retention period of 14 days
How will the log data be handled in this vRealize Log Insight cluster after the 14-day retention period?

  • A. Old log messages are automatically and periodically retired on least accessed basis.
  • B. A variable sized chunk of old log messages is deleted to free up space based on the data age basis.
  • C. Old log messages are automatically and periodically retired on a first-come-first-retired basis.
  • D. The user needs to manually select and delete specific old log messages to free up space.

Answer: B

 

NEW QUESTION 20
A healthcare company has mandated that all IP and DNS entries be allocated from an existing third-party IPAM solution. Also, for auditing purposes, all systems must handle user authentication via the existing open source LDAP directory.
When considering a logical design for this scenario, which is true about the dependency relationships of these systems?

  • A. The LDAP system is an upstream dependency and the IPAM system is a downstream dependency of vRealize Automation.
  • B. Both the IPAM and LDAP systems are external, upstream dependencies of vRealize Automation.
  • C. Both the IPAM and LDAP systems are external, downstream dependencies of vRealize Automation.
  • D. The IPAM system is an upstream dependency and the LDAP system is a downstream dependency of vRealize Automation

Answer: C

 

NEW QUESTION 21
A cloud architect is writing an implementation plan for deployment of a clustered vRealize Automation deployment that will use a third-party load balancer.
Which two steps should the architect include within the implementation plan to ensure a successful deployment of vRealize Automation? (Choose two.)

  • A. Disable all secondary nodes from the load balancer pools
  • B. Create and configure the monitoring of vRealize Automation and vRealize Orchestrator
  • C. Enable all non-primary nodes on the load balancer
  • D. Ensure all the SAN certificates for vRealize Suite are available
  • E. Turn off the health monitors or change them temporarily to default to ICMP and ensure traffic is still forwarding to the primary node

Answer: B,D

 

NEW QUESTION 22
An organization wants to implement a network topology to provide users with a one-way upstream access to the external network.
Which two statements are true for implementing such a network profile type using NSX-T Data Center? (Choose two.)

  • A. The external network should be left blank in the "Network Policies" tab
  • B. An SNAT rule is created on the Tier-1 router to allow the VM to communicate externally
  • C. The external network specified in the "Network Policies" tab will be used to assign an external IP to the VM
  • D. The cloud template must use the "private" network profile type
  • E. A DNAT rule is created o the Tier-1 router to allow the VM to communicate externally

Answer: B,C

 

NEW QUESTION 23
An architect is responsible for creating the design for vRealize Operations. The following requirements, constraints, and recommendations were gathered:
Enable Continuous Availability
Monitor two physical locations
The sizing guide recommends deploying 5 analytics nodes
What are two design considerations for the analytics node deployment? (Choose two.)

  • A. High Availability will need to be enabled
  • B. Two fault domains need to be created
  • C. Extra Large Nodes must be used
  • D. Anti-affinity rules will need to be created
  • E. A sixth analytics node is needed

Answer: B,C

 

NEW QUESTION 24
A customer has asked to have a vSphere cluster and Cloud Zone dedicated for Cloud Template development. The customer is going use the Cloud.vSphere.Machine compute resource type and they have been unable to quantify values for Favor Mappings during a requirements gathering exercise.
Which Flavor Mapping decision should be made for the Cloud Zone?

  • A. Create a single Flavor Mapping with a modest size
  • B. Flavor Mappings are not needed for the vSphere Cloud Zone
  • C. Create a single Flavor Mapping with the maximum size supported by vSphere
  • D. Create multiple Flavor Mappings with incremental sizes

Answer: D

 

NEW QUESTION 25
When designing a load-balanced vRealize Operations cluster, which three aspects should an architect consider? (Choose three.)

  • A. Simplifying the configuration of End Point Operations (EPOps) agents
  • B. Maximizing node participation in the handling of UI sessions and traffic
  • C. Minimizing node latency in the handling of UI sessions and traffic
  • D. Providing high availability if any admin or data node fails
  • E. Providing fault tolerance if any admin or data node fails
  • F. Reducing the number of certificates that must be managed for the nodes

Answer: A,C,D

 

NEW QUESTION 26
An architect is responsible for designing a new Operations Management solution for a customer. The customer has provided the following high-level information about their existing VMware Software Defined Data Center (SDDC) environment:
The existing environment is located within a single geographical region.
The customer already has deployed a vSphere-based virtualization solution that spans two well-connected physical locations.
The customer has recently upgraded all of their licenses to VMware vCloud Suite Advanced subscription.
The customer has already successfully deployed and configured vRealize Operations 8.x within the VMware SDDC.
The customer would like to ensure that both specific event monitoring data and operations monitoring for all of the VMware SDDC can be consolidated into a single user interface.
Which three recommendations should the architect make to meet the requirements? (Choose three.)

  • A. Configure vRealize Operations 8.x and vRealize Log Insight Cloud integration
  • B. Configure vSphere integration in vRealize Log Insight 8.x
  • C. Configure vRealize Operations 8.x and vRealize Operations Cloud Federation
  • D. Deploy vRealize Log Insight Cloud
  • E. Deploy vRealize Log Insight 8.x
  • F. Configure vRealize Operations 8.x and vRealize Log Insight 8.x integration

Answer: A,C,F

 

NEW QUESTION 27
What two statements are true about vRealize Operations Manager high availability (HA)? (Choose two.)

  • A. If the primary node fails, the replica node can take over all functions of the primary node.
  • B. Data collection must be restarted from the administrative interface when the primary node fails.
  • C. To enable HA, you must deploy at least 3 data nodes, plus the primary node.
  • D. With HA, data stored in the primary node is partially backed up on the replica node.
  • E. Upon failure of the primary node, failover to the replica is automatic.

Answer: B,E

 

NEW QUESTION 28
Which two statements are true when considering the vRealize Automation logical design for workload storage placement based on service levels, cost, and performance? (Choose two.)

  • A. First class disks are only supported in vRealize Automation Cloud
  • B. Storage placement is independent of vendor when using hard constraint tags
  • C. Storage constraint tag is applied to virtual machine resource and all the disks associated with the template
  • D. Secondary disk attached to the virtual machine resource use the same storage constraint tag as the virtual machine
  • E. vSphere tags can only be used in storage profiles

Answer: A,C

 

NEW QUESTION 29
A client wants to integrate a source control system to manage and maintain the cloud templates for their new installation of vRealize Automation.
Which solution should be included as part of the vRealize Automation logical design?

  • A. vRealize SaltStack Config
  • B. Git
  • C. Subversion
  • D. Gerrit

Answer: B

 

NEW QUESTION 30
A customer is deploying vRealize Log Insight (vRLI) in their data centers. The customer has the following:
Three data centers in three geographical locations.
Each site has 1000 logging sources that send events to vRLI.
The customer has the following requirements:
Minimize the resources footprint in the management cluster where vRLI will be deployed.
vRLI must be highly available with no single points of failure.
Logs collected from any data center must be protected against site failure.
Which three design decisions would the architect choose to achieve the requirements? (Choose three.)

  • A. Deploy nine vRLI "Medium" nodes in a single cluster in each data center.
  • B. Configure logs forwarding from each data center to another one.
  • C. Deploy four vRLI "Large" nodes in a single cluster in each data center.
  • D. Configure filters to forward critical logs to central vRLI cluster.
  • E. Configure filters to eliminate forwarding loops between vRLI clusters.
  • F. Configure logs forwarding from all data centers to a specific data center.

Answer: A,D,F

 

NEW QUESTION 31
A company has recently completed an audit and has found that there are many virtual machines in their production environment which no longer appear to be in use. To prevent this from happening in future, the company is deploying vRealize Automation and would like all provisioned VMs to meet following requirements:
VMs to have a default lease of 90 days and no more than 365 days
Lease policy can be overridden on case by case basis
Upon initial lease expiry, the VM should be kept for 10 days after which they will be destroyed Which policy design will meet the technical requirements?

  • A. Create a lease policy with the project scope, setting 90 days lease, 365 total lease and grace period to 10 and a soft enforcement
  • B. Create a lease policy with the project scope, setting 90 days lease, 365 total lease and grace period to 10 and a hard enforcement
  • C. Create a lease policy with the organization scope, setting 90 days lease, 365 total lease and grace period to 10 and a soft enforcement
  • D. Create a lease policy with the organization scope, setting 90 days lease, 365 total lease and grace period to 10 and a hard enforcement

Answer: A

 

NEW QUESTION 32
An architect has designed a vRealize Log Insight (vRLI) cluster for an organization. Details of the cluster are provided below:
3-node vRealize Log Insight cluster to collect logs for an organization NFS storage is enabled for archival data Once the NFS storage is full, which will be the resulting scenario?

  • A. vRLI will send a notification and automatically disable log archiving.
  • B. vRLI will stop ingesting new data and unless free space is available, loss of data will occur.
  • C. vRLI will automatically delete the oldest archived logs, resulting in archived data loss.
  • D. vRLI will further compress the active logs to make more space available in NFS storage.

Answer: B

 

NEW QUESTION 33
An architect is tasked with the following:
Build a private cloud solution for an organization using VMware vRealize Automation.
This private cloud needs to manage two different datacenters separated geographically.
The private cloud solution needs to be highly available.
Which of the following approaches can the architect take to achieve this?
Note: VMware Identity Manager has been renamed as VMware Workspace ONE Access.

  • A. Deploy a single-node Workspace ONE Access instance in a single-site design architecture in one of the datacenters.
  • B. Deploy a Workspace ONE Access cluster in a multi-site design architecture with 3-nodes spanning both the datacenters.
  • C. Deploy a Workspace ONE Access cluster in a multi-site design architecture with 3-nodes in each of the datacenters.
  • D. Deploy a 3-node Workspace ONE Access cluster in a single-site design architecture in one of the datacenters.

Answer: C

 

NEW QUESTION 34
An architect is responsible for designing a new multi-cloud management solution for a customer. The customer has a cloud first strategy ad has provided the following high-level information about their current usage of the cloud:
The customer has public cloud presence in AWS, Azure and GCP and uses a number of native cloud services.
The customer runs all vSphere-based workloads within VMware Cloud on AWS.
The customer would like to ensure they have the ability to deploy and monitor supported workloads and native services in any of their clouds.
In addition to the deployment of vRealize Automate Cloud, which two recommendations should the architect make to meet the requirement? (Choose two.)

  • A. Deploy a vRealize Operations Cluster in VMware Cloud on AWS and configure integration to vRealize Automation Cloud.
  • B. Create Cloud accounts in vRealize Operations Cloud for AWS, Azure and VMware Cloud on AWS. GCP must be configured through the management pack.
  • C. vRealize Operations Cloud and vRealize Log Insight Cloud must be deployed into the same organization as vRealize Automation Cloud.
  • D. Create Cloud accounts in vRealize Operations Cloud with each of the cloud services to enable monitoring.
  • E. vRealize Operations Cloud and vRealize Log Insight Cloud must be deployed into the same organizations as VMware Cloud on AWS.

Answer: A,E

 

NEW QUESTION 35
......

Step by Step Guide to Prepare for 3V0-32.21 Exam: https://examdumps.passcollection.com/3V0-32.21-valid-vce-dumps.html